About the Project
The Golden 1 Center is located in the heart of Sacramento at the Downtown Plaza Mall. The multi-use arena was envisioned as an iconic civic space that works 365 days a year and celebrates the best of Sacramento and all it has to offer by incorporating indoor and outdoor design elements. It’s being called the “highest-tech stadium in sports” with a 4K video board, an ultra-interactive app for fans to use during events, and a massive amount of connectivity within the building. When it opens in Fall 2016, there will be no arena like it.
The building frame will consist of structural steel/braced frame construction, will seat approximately 18,000 people, and have a total gross area of approximately 674,000 square feet.
Services Provided
MatriScope was contracted to provide special inspections and materials testing services for the project related to:
- cast-in-place concrete
- shotcrete
- precast concrete
- concrete unit masonry
- structural steel framing
- NDT
- spray applied fireproofing
- waterproofing
- roofing application
MatriScope and associated sub-consultants also provided all off-site inspection and testing including laboratory testing services for all related construction materials, pre-fabricated concrete, buckling restrained brace (BRB), miscellaneous steel and structural steel inspection and ultrasonic testing (UT), in various states including California, Arizona, Utah, and Illinois.